What each plan allows for scheduled tasks, how many can be recurring, how long one run may take, how the safety limit on tool calls in a run works, and what happens to your tasks when you move to a lower plan.

Each plan sets limits for scheduled tasks. They decide how many tasks you can keep running, how many of them can be recurring and how long one run may take. Free does not include scheduled tasks at all. To set one up, read How do I schedule a task?

Limits by plan

The amounts depend on your plan, and a higher plan allows more of each:

  • The number of tasks you can keep active at once, one-time and recurring.
  • The number of recurring tasks you can keep active at once.
  • The longest time one run may take.
  • The number of tasks that start when something happens that you can keep active at once.
  • The number of runs that events can start in 24 hours.

A task is active when it is set to run on its schedule. Paused, completed, failed and canceled tasks do not count towards these limits.

There is no plan limit on how many tool calls a task can make. A tool call is one step the assistant takes during a run, such as searching the web, reading a file or sending an email. Each step uses your usage allowance, like the same step in a chat. To keep a task that goes wrong from running on unattended, each run also stops when it reaches the most one run may cost, its time limit, or a safety limit on tool calls in one run that is the same on every plan. If a run reaches one of these limits, it stops. Bluedeer lists the run in the Inbox under Needs your attention as Task limit reached, and if the task has Notify on failure turned on, it also sends you a notice. Each run's time limit is shown in Results & history.

In a shared workspace, the limits come from the seat of the person who owns the task. A Pro seat gives the Pro limits and a Max seat gives the Max limits. Each member's tasks are counted on their own.

Tool calls per run

The Overview tab of a task shows a Tool calls row. It says how many tool calls one run may use. When it ends in "(default)", you have not chosen a number, so the safety limit applies. It is the same on every plan, and moving to another plan does not change it.

To choose your own, lower number, open Edit task and fill in Tool calls per run (optional). Leave it blank to go back to the safety limit.

  • A number lower than the safety limit is kept.
  • A number higher than the safety limit is refused. Bluedeer does not save the change and tells you the highest number you can use.

Tasks that start when something happens

Tasks that start on an event, such as a new email or a web request, count towards the active tasks above and have two more limits: how many of these tasks you can keep active, and how many runs events can start in 24 hours. See Start a task when something happens. A task over the first limit is paused when it is next due, like any task over a limit. An event that arrives after the daily limit starts nothing: Run history lists the run as Limit reached, and a webhook's Last deliveries shows Limit reached.

Creating and restarting tasks

Bluedeer checks the limits when you create a task and when you resume a paused one. If you already have as many active tasks as your plan allows, the new task is not created. A recurring task is also refused when you already have as many recurring tasks as your plan allows, even if you have room for more one-time tasks. A paused task that cannot be resumed for this reason stays paused.

To make room, pause or cancel a task you no longer need. See How do I run, pause, edit or cancel a task?

When you move to a lower plan

Bluedeer does not stop your tasks the moment your plan changes. It checks each task when that task is next due to run.

  • The oldest active tasks keep running, up to the new plan's limits. Newer tasks are paused when they are next due. Bluedeer does not ask which ones to keep.
  • A task that is paused this way shows Paused, and does not run again until it is resumed. The task says that the plan now allows fewer running tasks.
  • If your plan no longer includes scheduled tasks (Free does not, by default), every task is paused the next time it is due.
  • A task in your personal workspace that was paused because of your plan starts again on its own, within a few minutes, once your plan covers it again, for example after you upgrade or after a failed payment succeeds. The oldest tasks come back first, as far as the plan's limits allow, and a task you paused yourself stays paused. A task in a shared workspace that was paused because of your plan does not start again on its own when your plan changes: upgrade your plan, then open the task and select Resume. Resuming is refused if your plan is still full.
  • A failed payment puts your plan on hold at once, so your tasks are paused as they would be on Free. A task that starts when something happens pauses at once instead of when it is next due.
  • A run in progress is checked at each step. A lower time or cost limit applies straight away. If the new plan no longer has room for the task, the run stops and the task is paused.